
Come and have a look at some of our most recent work. It's a great way to get some inspiration.
International House in Ashford was a multi-tenanted building with a tired reception area that didn't help attracting new companies into the building.
KLC have refurbished the reception area out of hours over the course of a three week period, creating a more modern, bright and vibrant space that can used for meeting and greeting clients as well as incorporating an informal meeting area.
Part of the problem with the existing reception was the lighting. The reception was large in size but dark and tired. KLC introduced feature lighting in the form of a dropped ceiling raft detail and spot lighting to the perimeters to ensure there were no dark corners.
All the light fittings are low energy fittings with long life lamps to ensure that International House not only looks good but green too.
Why not download the SEEDA case study. It's a great way to share ideas with others in your office.
No hard sell, no obligation, we promise. Why not contact us to schedule one of our team to come over and have a chat? Call us today on 01474 708000.
Coming Soon
| < Prev | Next > |
|---|

Come and have a look at some of our most recent work. It's a great way to get some inspiration.
"Once the idea for an I-Lab at the Nucleus was going to become a reality we knew that we had to find a company that would be able to take the concept and come up with a design that would be time proof and modern but also practical and useable..."
Company: Start International
Client Position: Building Manager