Kazimir - With only 9 days in which to completely strip out back to concrete shell and refit Kazimirs offices to include new full height glazed Polar partitioing with glass sliding doors, storage wall system, suspended ceilings and access flooring new data, power, lighting, and fire systems. Two boardrooms were installed with walnut veneered AV wall and a dividing movable wall. The install included a full range of system furniture and seating. We supplied all staff with packing cases and collected these and put them into storage on the Friday evening just before work commenced. 9 days later we brough the cases back and placed them by each new workstation ready for the staff to return on the Monday morning. 'A stunning result' were the words of our client when we handed back the keys. |